PROJECT CONTROLS MANAGER

January 23, 2015

NOTE: This job listing has expired and may no longer be relevant!

150_zachry
Job Description
Zachry Industrial, Inc. is currently seeking Project Control Manager for its Home Office in San Antonio, TX.

Position Summary:
The Project Controls Manager position is responsible for providing project management with Quantity, Earned Value progress, Cost and Cost Forecast information in order to make the best decisions possible to achieve project goals. The Project Controls Manager oversees several key project functions, which require accurate reporting of cost and cost projections, production of timely and accurate data, and delivery of key documentation to field supervision. Information produced under the direction of the Project Controls Manager is typically analyzed with recommendations developed prior to wider communication to project and corporate management.Due to the nature and location of Zachry’s projects, a willingness to relocate is essential for this role. There may be a brief training period in the corporate offices prior to assignment to a project site.

Position Responsibilities:

  • Ensure transparency on behalf of the project team and the enterprise related to project issues or any known items that may impact the accurate and timely projection of the project cost to complete through timely and purposeful communication. Interface with project team and designated support departments to help influence optimal decisions for onsite construction methods.
  • Maintain functional knowledge of contractualrequirements and ensures project team understands and adheres to necessary obligations. Identify and manage any contractual changes taking initiative to initiate project correspondence and proper documentation.
  • Be responsible for jobsite document and technicalinformation management, manage expectations and flow of project engineering design information to support planned construction sequence. Interface with the Project Engineer, Project Executive, field supervision, design engineers, and client/owner to isolate issues and develop solutions. Insure RFI Processes are followed and any issues addressed and resolved.
  • Manage all aspects of jobsite document controlincluding the project filing system, distribution processes, and auditing to ensure the project team is operating from the most recent documents.
  • Participate in risk and opportunity analysis for theproject. Contribute to the project risk and opportunity identification and measurement process. Manage development of special risk analysis studies for the project.
  • Manage all aspects of the jobsite change management processes including engineering rework, vendor related charges, and subcontractor support .
  • Take action as a primary advocate of the benefits offormal project control processes. Manage implementation of corporate Responsible Business Practices and relevant Standard Operating Procedures at the jobsite. Ensure Corporate Project Controls Policies and Procedures are properly implemented and followed.
  • Provide supervision and guidance to the Cost andEarned Value team on the project to ensure that all cost and earned value team members are performing in accordance with corporate guidelines and policies. Key areas of this function include, but are not.


limited to:

  • Ensure accurate material take-offs are beingdone and electronic download of material takeoffs are being confirmed,
  • Establish quantity tracking system for installed quantities and provide detailed tracking and reporting of engineering designed quantities in comparison to estimated quantities,
  • Overseeing the Earned Value process and theutilization of Qtrax,
  • Insuring proper progress is verified andrecorded,
  • Insuring proper time is charged to cost codes,
  • Manage project progress and cost projectionreporting,
  • Overseeing the Cost Reporting on the project,such as weekly cost reports, monthly cost reports, and projections,
  • Overseeing the proper use of Standard Cost Codesand Typicals,
  • Oversee the Change Management Process,
  • Oversee cost reporting to the Joint Venture,
  • Review and coordinate cost reporting to JV,
  • Provide SOV and Billing Support to JV or ProjectManagement,
  • Oversee and assist in all month-end projectreporting requirements,
  • Monitor and maintain proper cost metricreporting values. Provide supervision and guidance to the Document Control Team to ensure that all document control functions are performed in accordance with corporate guidelines and policies. Key areas of this function include but are not.


limited to:

  • Proper logging, stamping, and filing of all documentation received on site
  • Proper duplication and issuing of all project documentation in a timely manner
  • Ensure the proper use of corporate softwareThe Project Controls Manager is responsible for the coaching, mentoring, development, and training of his/her staff per corporate guidelines. This includes


but is not limited to:

  • Performing employee reviews and participation in talent planning discussions
  • Ensuring continuing education is met every year
  • Managing personnel and staffing issues per corporateguidelines
  • Attend and hold any and all meetings andpresentations internal and external that support or facilitate all the above Essential Skills, Knowledge, and Abilities (Include any


training, licenses and certifications):

  • Bachelor’s degree (B.S.) in Engineering or relatedTechnical Program from four-year College or University
  • 5-8 years of relevant construction experience
  • Required: Microsoft Office Products including Excel,Word, and PowerPoint
  • Demonstrated understanding of project cost, earnedvalue, CPM scheduling and detail planning, contract management concepts
  • Commitment to Accuracy and Reliability

Valued but not required skills, knowledge and abilities:Knowledge of:

  • License Requirements: Professional EngineerPreferred
  • Primavera P6, @Risk, CMIS, SAP, Earned ValueSystems, Oracle Contract Manager, CAD/ConstructSim, Oracle Procurement, Hard Dollar
  • PMI Certification
  • VBA

Supervisor:
The Project Controls Manager reports to the Project Engineer or Construction Coordinator when assigned to a project with matrixed reporting to a Project Controls Operations Support Manager.

Reporting to this position:
This position provides direct supervision or through work leaders or assistants, typically with a subordinate group of up to ten (10) employees. Position requires
estimating of personnel needs and assignment of work to meet completion dates in accordance with established schedules. Supervise, coordinate and review the work of assigned staff. Recommend candidates for employment, conduct performance evaluations and salary reviews for assigned staff and administer company policies.

Physical demands and work environment:

  • Physical demands: Must be able to lift a minimum of10 lbs. (Occasionally more)
  • Work environment: General office environment andoutdoors occasionally with extreme weather conditions. Must be able to work along and with others including customer contact, suppliers and Design Engineers. Must be able to withstand loud noise conditions occasionally. Zachry is dedicated in providing a Safe and Drug Free work environment; and is an Equal Opportunity Employer.

How to Apply

Apply for this job

Apply for this Job

Paste your AdWords Remarketing code here